Need fire stopping for a refurbishment, fit-out or an existing building with identified defects? Cerberus provides fire stopping installation and remedial works nationwide from Doncaster, supporting contractors, councils, housing associations and commercial property managers. Send your drawings, compartmentation survey or photographs so we can review the scope and quote for the work.
Unsealed service openings, damaged seals or changes to pipework and cabling may need further assessment and remedial work. Share the findings of your compartmentation survey or fire-risk assessment so the required work can be defined.
Send a defect schedule with locations and photographs. We review the recorded issues and identify what further site information is needed before agreeing a quotation.
Tell us about residents, building users, restricted areas and access hours. These details help establish a practical programme for housing portfolios and commercial premises.
Coordinate fire stopping with your building and M&E works. Provide service sizes, wall or floor construction and required fire resistance so an appropriate system can be considered.
Fire-stopping products must be selected and installed for the actual substrate, service type, opening and tested system. No single product should be assumed suitable for every detail.
Sealing around pipes, cables and other services through fire-resisting construction.
Systems for wall/head interfaces, joints and construction gaps where specified.
Solutions for concealed cavities, subject to building and system requirements.
From our Doncaster base, we support fire-stopping projects across the UK. Send the site location, survey findings and scope so we can confirm the installation requirements, access arrangements and programme.
Fire stopping around service penetrations and construction joints as part of refurbishment, fit-out and building works. Share drawings and service details so the proposed system can be reviewed against the actual opening and substrate.
Discuss identified compartmentation defects and planned fire-stopping works across your properties. Survey records, locations and photographs help us establish the scope and coordinate access.
Support for fire-stopping installation and remedial requirements in commercial buildings. Provide the findings from your survey or assessment, together with occupancy and access information.
Include the site postcode, drawings or survey report, photographs of the openings, service types, approximate quantities and required programme. We will clarify missing details and confirm the project-specific scope before quotation.
Yes. Cerberus Fire works nationwide. Doncaster is our base, and we review enquiries for projects throughout the UK.
Send your compartmentation survey or defect schedule, photographs and site information. We can discuss the fire-stopping work required and any further information needed to define the scope.
Project-specific records and reporting support the installation work. The required photographs, identification and handover information are agreed for your project.
A closer look at service penetrations, pipework and cable containment details from our projects. Select a photograph to see the full image.











